ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects

Print

PL - CZ interconnection - GAZ-SYSTEM S.A.

209

TRA-N-273

PL - CZ interconnection

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

GAZ-SYSTEM S.A.

Operator

GAZ-SYSTEM S.A.

TEN-E Project ?

Project of Common Interest

Interested by PCI ?

Yes

IGAs

None

Polishsection, Gas Transmission OperatorGAZ- SYSTEM S.A. (100%)

Czechsection, NET4GAS, s.r.o. (100%)

Web Link

Undefined (100,00%)

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

# of Pipelines, nodes, CS

Considered TPA Regime

End of permitting phase

1

Regulated

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

2017

+107.60

Total Compressor Power (MW)

Applied for Exemption ?

Construction

+16.00

No

Exemption granted ?

Commissioning

Expected Load Factor

Not relevant

2019

% Exemption in entry direction

Last completed Phase :

0%

Planned

% Exemption in exit direction

0%

Baltic Energy Market Interconnection Plan GRIP 2014–2023 Annex | 40

Made with