ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects
Upgrade of the LNG terminal in Świnoujście - GAZ-SYSTEM S.A.
294
LNG-N-272
Upgrade of the LNG terminal in Świnoujście
Non-FID
LNG Terminal
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
GAZ-SYSTEM S.A.
Operator
GAZ-SYSTEM S.A.
TEN-E Project ?
Not part of TEN-E
Interested by PCI ?
Yes
IGAs
None
Web Link
en.gaz-system.pl/terminal-lng/
Undefined (100,00%)
Gas Transmission OperatorGAZ- SYSTEM S.A. (100%)
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Regasification facility
Considered TPA Regime
End of permitting phase
LNG terminal in Świnoujście
Regulated
Considered Tariff Regime
FID
Expected volume (bcm/y)
Regulated
2014
+2.50
Applied for Exemption ?
Construction
Storage capacity (m3)
No
+160,000.00
Exemption granted ?
Commissioning
Send-out (mcm/d)
Not relevant
2020
+6.84
Last completed Phase :
Ship size (m3)
% Exemption in entry direction
0%
Planned
216,000.00
% Exemption in exit direction
Reloading ability ?
0%
Yes
Baltic Energy Market Interconnection Plan GRIP 2014–2023 Annex | 65