ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects

Print

Upgrade of the LNG terminal in Świnoujście - GAZ-SYSTEM S.A.

294

LNG-N-272

Upgrade of the LNG terminal in Świnoujście

Non-FID

LNG Terminal

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

GAZ-SYSTEM S.A.

Operator

GAZ-SYSTEM S.A.

TEN-E Project ?

Not part of TEN-E

Interested by PCI ?

Yes

IGAs

None

Web Link

en.gaz-system.pl/terminal-lng/

Undefined (100,00%)

Gas Transmission OperatorGAZ- SYSTEM S.A. (100%)

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Regasification facility

Considered TPA Regime

End of permitting phase

LNG terminal in Świnoujście

Regulated

Considered Tariff Regime

FID

Expected volume (bcm/y)

Regulated

2014

+2.50

Applied for Exemption ?

Construction

Storage capacity (m3)

No

+160,000.00

Exemption granted ?

Commissioning

Send-out (mcm/d)

Not relevant

2020

+6.84

Last completed Phase :

Ship size (m3)

% Exemption in entry direction

0%

Planned

216,000.00

% Exemption in exit direction

Reloading ability ?

0%

Yes

Baltic Energy Market Interconnection Plan GRIP 2014–2023 Annex | 65