ENTSOG South-North Corridor GRIP 2017 - Main Report
Number of Projects
14
12
10
8
6
4
2
0
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
TRA – FID TRA – Advanced Non-FID TRA – Less-Advanced Non-FID
UGS – FID UGS – Advanced Non-FID UGS – Less-Advanced Non-FID
LNG – FID LNG – Advanced Non-FID LNG – Less-Advanced Non-FID
Figure 2.4: Temporal distribution of infrastructure the projects per class (LNG, storages, pipelines) and status (FID, advanced non-FID and less-advanced non-FID) in the South-North Corridor Region (Source: ENTSOG data collection for TYNDP 2017 based on information submitted by TSOs and other project promoters)
Considering the expected commissioning date for each project, Figure 2.4 shows that 2018 will be the year in which the highest number of projects is foreseen to go into operation (corresponding to the year of commissioning of the reverse flow project between Italy, Switzerland, France and Germany). The expected commis- sioning dates for LNG terminals or expansion projects range from 2019 to 2022, while storage facilities are declared to become operational within a broader time span (2016– 2026). Transmission projects are positioned in an intermediate time horizon, with FID and more advanced projects obviously being closer to commis- sioning.
Image courtesy of Open Grid Europe
South-North Corridor GRIP 2017 |
21