Modern Mining April 2016
GOLD
project offers fast payback
of ore near the base of oxidation. The calculated recovery of gold for this sample was 80,1 %. While this is lower than the 2014 testwork pro- gramme, which recovered 89 % of contained gold, the 2014 sample was sourced from the top 20 m of the saprolite orebody. African Gold believes the difference between the two is likely
General layout of the proposed mine at Kobada.
A drill rig in action during a recent drill programme at Kobada for metallurgical and geotechnical testwork.
April 2016 MODERN MINING 31
Made with FlippingBook