ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 57 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility Feasibility FEED Market Test

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (NDP 2016-2025)

Regulated Regulated

TRA-N-133

03/2012

06/2018 06/2015

No

Currently PCI

Exemption Granted

Yes (6.4)

Not Relevant

Permitting Supply Contracts FID Construction Commissioning

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

No

0.00% 0.00%

Not Relevant (no CBCA decision)

2020

2020

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

The pipeline length at CZ side is approx. 12 km and at AT side is approx. 49 km; no compressor station is considered at CZ side.

%ĝHFODY &= 3RäWRUQi 5HLQWDO &= $7

800

12

Total

12

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Time Schedule

Grant Obtention Date Delay Since Last TYNDP Delay Explanation

01/10/2014