ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 66 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility Feasibility FEED Market Test

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (NDP 2017-2026 (new project))

Regulated Regulated

TRA-N-752

10/2015

06/2018 02/2016

No

Currently PCI

Exemption Granted

No

Not Relevant

Permitting Supply Contracts FID Construction Commissioning

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

No

0.00% 0.00%

Not Relevant (no CBCA decision)

2019

2020

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

The project comprises several technical measures, which leads factually to entry capacity increase between DE (Gaspool) and CZ. The incremental capacity represents approx. entry capacity extension between the market areas of DE (Gaspool) and CZ. Total

C4G - DE/CZ

Benefits

Main Driver

Market Demand

Main Driver Explanation Benefit Description

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM