ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 106 of 620

Upgrade IP Deutschneudorf and Lasow

TRA-N-814 Update Date

Project

Pipeline including CS

Non-FID Advanced

25/05/2016

7KH JDV SUHVVXUH UHGXFWLRQ DQG PHWHULQJ VWDWLRQV DW *UR‰ .|ULV DQG .LHQEDXP ZLOO EH XSJUDGHG WR 9Q 0LR Pࢗ h and Vn 1,7 mࢗ h respectively. The transmission pipeline Sayda - Deutschneudorf will be upgraded to DN 800, DP84. The compressor station Sayda will be upgraded to an inlet pressure pmin = 41 bar, outlet pressure pmax = 84 bar and throughput Vn 700 Tmࢗ h. The pressure transfer to/from FGL 218 (DN 600, DP 84) will be upgraded to MOPu 84 bar and MOPd 55 bar. These investments will create additional exit capacity to Czechia (at Deutschneudorf IP) and Poland (Lasow IP) for transit/transmission of natural gas arriving in Germany via Nord Stream 2.

Description

Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point

Operator

Year 2016 2019

From Gas System To Gas System Capacity

26.6 GWh/d 14.4 GWh/d

ONTRAS Gastransport GmbH ONTRAS Gastransport GmbH

PL

DEg

DEg

PL

GCP GAZ-SYSTEM/ONTRAS

Comment: Enabled by EUGAL project submitted by GASCADE

45.4 GWh/d

ONTRAS Gastransport GmbH

2019

PL

DEg

Comment: Entry pressure of 63 bar required by GAZ-System

55.2 GWh/d

ONTRAS Gastransport GmbH

2019

DEg

CZ

+RUD 6YDWp .DWHĝLQ\ &= 'HXWVFKQHXGRUI 6D\GD '(

Comment: Enabled by EUGAL project submited by GASCADE

Sponsors Compressor station Sayda ONTRAS Gastransport GmbH

General Information

ONTRAS Gastransport GmbH ONTRAS Gastransport GmbH

Promoter

100% 3UHVVXUH UHGXFWLRQ DQG PHWHULQJ VWDWLRQV DW *UR‰ .|ULV and Kienbaum ONTRAS Gastransport GmbH 100% Transmission pipeline Sayda - Deutschneudorf ONTRAS Gastransport GmbH 100%

Operator

Host Country

Germany Planned

Status

Website Publication Approval Status

Approved

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM