ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 136 of 620
NDP and PCI Information
Schedule
Start Date
End Date 09/2012
Third-Party Access Regime
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
No (Valid energy NDA ENMAK 2020 foresees the diversification of energy supply via construction of LNG terminals p.18 The construction of LNG infrastructure is on the list of foremost measures p.40 and activities p.41 As this NDA was adopted in 2009 no specific PCI projects could be listed.)
Regulated Regulated
Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
No
Exemption Granted
Not Yet
Part of NDP
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
NDP Number
2019
2019
Currently PCI
Yes (8.1.2.3)
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
Technical Information (LNG)
LNG Facility
Tallinn LNG
Expected Volume (bcm/y) Storage Capacity (m3)
4
160,000 160,000
Ship Size (m3)
Terminal berths can recieve any size LNG carrier on the market
Reloading Ability
No
PCI Details
Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at supplying directly or indirectly at least two Member States
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM