NDP and PCI Information

Schedule

Start Date

End Date 09/2012

Third-Party Access Regime

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

No (Valid energy NDA ENMAK 2020 foresees the diversification of energy supply via construction of LNG terminals p.18 The construction of LNG infrastructure is on the list of foremost measures p.40 and activities p.41 As this NDA was adopted in 2009 no specific PCI projects could be listed.)

Regulated Regulated

Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning

No

Exemption Granted

Not Yet

Part of NDP

Exemption in entry direction Exemption in exit direction

0.00% 0.00%

NDP Number

2019

2019

Currently PCI

Yes (8.1.2.3)

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

Technical Information (LNG)

LNG Facility

Tallinn LNG

Expected Volume (bcm/y) Storage Capacity (m3)

4

160,000 160,000

Ship Size (m3)

Terminal berths can recieve any size LNG carrier on the market

Reloading Ability

No

PCI Details

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at supplying directly or indirectly at least two Member States

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments