2040 Comprehensive Plan: Envision Shakopee

Figure 4.42 - DRAFT SHAKOPEE ROADWAY IMPROVEMENTS NEEDS LIST Project Limits Year

Running Header Place Holder

Description

250 Running Header Place Holder 2 1 3 4 6 7 8 Transportation 5 HWY 169 Crossover Project 12th Avenue Reconstruction Shenandoah Intersection Vierling Dr Extension Barenscheer Blvd CH 16 Pedestrian Crossings CH 42 Expansion CH 16 Extension Tintaocanku Shenandoah Drive Extension CH 83 Operational Running Header Place Holder Running Header Place Holder Running Header Place Holder Running Header Place Holder Running Header Place Holder

TH 169 / Mobile Manor Frontage Rd

US 169 to Mobile Manor South of CH 14 to CH 69 CR 83 to Valley Park US 160 to Barenscheer Vierling Drive/12th Ave 12th Ave to Barenscheer Canterbury to Shenandoah

2018 New frontage road

2018 Paved crossovers on TH 169 2019 Reconstruct roadway 2021 Operational and capacity

Canterbury RD (CR 83) Reconstruction

2019 Hybrid roundabout

2020 2-lane roadway extension 2020 Realign and expand roadway.

Eagle Creek Blvd/Vierling Dr Roundabout Highways 169/41/78/14 Interchange

Eagle Creek/Vierling Highways 169/41 Variuos Locations

2020 Roundabout

2018 New diverging diamond interchange 2018 Install RRFBs at school crossing locations

CH 17 to CH 83

2020 Expand to 4-lanes 2020 New road alignment

Windermere to CH 69 McKenna to CH 83

2018 New roadway

Shenandoah to 12th

2019 New road alignment

4th to CH 101

2018 Add turn lanes

ENVISION SHAKOPEE | SECTION IV: BUILT ENVIRONMENT

Made with FlippingBook flipbook maker