Steel Framing Sections
5-7.Flange Brace XFBT-2 and XFBP-7
NOTE: · Fill all holes in the flange brace with bolts. · If flange brace connection occurs within the purlin lap, install flange brace before tightening purlin bolts. · Flange brace may be one side only. For location and number of sides refer to Cross Sections, Endwall and Sidewall drawings. · Flange brace is sent shop assembled; 3/4" diameter bolt will require additional tightening at time of installation. See Cross Section for proper tightening procedure.
BRACE DISTANCE
RAFTER/COLUMN PURLIN/GIRT
8 1/8"
(2) 1/2" X 1 1/4" BOLTS
(1) 3/4" X 2" BOLT
FLANGE BRACE (FB-x)
(1) 3/4" X 2" BOLT
FLANGE BRACE "5-7 CONNECTION"
Made with FlippingBook - Online catalogs