Article 2: Administration Section 2.5. Application-Specific Review Procedures 2.5.10. Riparian Buffer Development Review

development. It also authorizes submittal of an application for Building Permit for construction of approved buildings and structures in the Floodplain Overlay (FO) district, construction of

approved site improvements, approved alteration or relocation of watercourses, and other approved land disturbing activities in the FO district. b. Expiration of Approval A Floodplain Development Permit shall expire if an application for a Building Permit (or Certificate of Compliance/Occupancy, if a Building Permit is not required) for the approved development is not submitted within two years after the date of the Construction Plan Approval, As-Built Elevation Certificate Before a Certificate of Compliance/Occupancy may be approved for development subject to the Floodplain Development Permit, the applicant shall submit a final, “as-built” elevation certificate prepared by, or under the direct supervision of, a professional land surveyor or engineer to the Town Engineer for approval. d. Inspections Town staff and agents may inspect sites undergoing development authorized by a Floodplain Development Permit to determine whether development activities conform to approved plans and terms of the permit and comply with non-encroachment requirements. C. Floodplain Development Permit Review Standards An application for a Floodplain Development Permit shall be approved only if the Town Engineer determines that the proposed development complies with all applicable standards in Section 5.6, Floodplain Management. c.

Sign Permit

Step is Applicable

Step is Not Applicable

Pre-Application Conference

Application Submittal and Acceptance

Staff Review and Planning Director Decision

Scheduling and Notice of Meeting

Planning and Zoning Board Review and Recommendation

Town Council Review and Decision

Figure 2.5.12.B

(Ord. No. 2014-051, 11/10/2014)

2.5.10. Riparian Buffer Development Review

See Section 6.5, Riparian Buffer Development Review.

2.5.11. Stormwater Management Permit

See Section 7.2, Administration and Procedures.

2.5.12. Sign Permit

A. Applicability

General The procedure and standards in this subsection apply to the review of applications for a Sign Permit, which shall be required before the erection, installation, construction, alteration, or moving of any sign unless exempted from this Ordinance signage regulations in accordance with subsection 2 below, or from the permit requirements in accordance with subsection 3 below.

Morrisville, NC

June 23, 2017

Unified Development Ordinance

Page 2-53