WIRELINE - Autumn 2017
MER | Montrose Area
Mike Sinclair (left) and Brian Winton (above) played key roles in the Montrose Area Redevelopment
July 2015
Summer 2015
May 2016
May 2016
Summer 2017
The 10,500 tonne topsides for the new bridge-linked platform are transported to the ield and lifted onto the jacket
The 71-metre, 350-tonne bridge and lare are lifted into position
Drilling campaigns get under way for Cayley and Shaw
First oil from Cayley and Shaw
First oil from Godwin
AUTUMN 2017 | 3 1