Caterpillar Performance Handbook, January 2017, SEBD0351-47
Trenching Production
Hydraulic Excavators
7) Estimate cycle time (23 sec) based on anticipated conditions and enter on scale H. 8) Estimate hourly digging time (27 min) and enter on scale I. 9) Connect H through I to scale J for cycles per hour.
(get loose volume from scale E and enter on this page scale E) 5) Enter required linear production rate 9 m/h (30 t/hr) on scale G. 6) Connect E and G. Transfer hourly production rate from scale F to scale K (next page).
E LOOSE VOLUME
F HOURLY PRODUCTION
G LINEAR PRODUCTION
H CYCLETIME
I DIGGING TIME/HR.
J CYCLES PER HOUR
100’s of min Sec
Cycles/hr
LCM/m LCY/ft
m/h
ft/hr
LCM/m LCY/ft
7
% of Hour %
Digging time/hr min
Edition 47 7-259