Caterpillar Performance Handbook, January 2017, SEBD0351-47
Lifting Capacities ● MH3024 (Grenoble Sourced)
Material Handlers
Lift Capacities All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (9040 lb), heavy lift on.
Load point height
Load over front
Load over rear
Load over side
Load at maximum reach (sticknose/bucket pin)
Undercarriage
Boom
Stick
MH or Standard
VA
8'2"
10 ft
15 ft
20 ft
25 ft
ft
Undercarriage configuration MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown
*8600 *8600 *8600 *8600 *8600 *8600 *8600 *8600 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7000 *7000 *7000 *7000 *7000 *7000 *7000 *7000 *6900 *6900 *6900 *6900 *6900 *6900 *6900 *6900 *7100 *7100 *7100 *7100 *7100 *7100 *7100 7100
*8600 *8600 *8600 *8600 *8600 *8600 *8600 *8600 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7000 *7000 *7000 *7000 *7000 *7000 *7000 *7000 *6900 *6900 *6900 *6900 *6900 *6900 *6900 *7100 *7100 6700
*8600 *8600 *8600 *8600 *8600 *8600 *8600 *8600
18.83
25 ft
12,900 12,900
9600
7400
*14,800 *14,800 *14,800
*7400
12,600 11,900
9200
7000
*14,800 *14,800 14,100
*7400
20 ft
23.03
13,000 11,500
9200
7000
*14,800 *14,800 14,500
*7400
13,000 11,900
9300
7100
*14,800 *14,800 *14,800
*7400
*18,900 *18,900 14,400 12,500 12,500
9300
8700
8700
6400
6100
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
*18,900 18,300 13,800 12,300 11,600
8800
8500
8000
6100 9500 6100 9800 6100
5800
*18,900 *18,900 *18,900 *15,400 *15,400 13,800 *10,700 *10,700
*7000
25.56
15 ft
*18,900 17,700 13,800 12,700 11,200
8800
8800
7700
5800
9
*18,900 *18,900 *18,900 *15,400 *15,400 14,200 *10,700 *10,700
*7000
*18,900 18,200 14,000 12,600 11,600
8900
8700
8000
5900
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
18,400 18,400 13,200 12,000 12,000
8700
8500
8500
6200
5500
*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 *13,000
*6900
18,200 16,900 12,600 11,700 11,100
8300
8300
7900
5900 9400 5900 9600 6000
5200
*22,700 *22,700 20,600 *16,300 *16,300 13,200 *13,000 *13,000
*6900
10 ft
26.87
18,800 16,300 12,600 12,100 10,700
8300
8600
7600
5200
*22,700 *22,700 21,300 *16,300 *16,300 13,600 *13,000 *13,000
*6900
18,700 16,800 12,700 12,100 11,000
8400
8500
7800
5300
*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 11,500
*6900
17,200 17,200 12,100 11,400 11,400
8200
8300
8300
6000
5300
*25,300 *25,300 *25,300 *17,800 *17,800 *17,800 *13,600 *13,600 13,500
*7100
16,900 15,700 11,500 11,100 10,500
7800
8000
7600
5600 9100 5600 9400 5700
6700
5000
*25,300 *25,300 19,300 *17,800 *17,800 12,600 *13,600 *13,600
*7100
*7100
5 ft
27.17
17,600 15,100 11,500 11,600 10,100
7800
8400
7300
6400
5000
*25,300 *25,300 20,000 *17,800 *17,800 13,000 *13,600 *13,600
*7100
*7100
17,400 15,600 11,600 11,500 10,400
7900
8300
7600
6700
5000
*25,300 *25,300 24,800 *17,800 *17,800 15,800 *13,600 *13,600 11,200
*7100
*7100
16,600 16,600 11,600 11,000 11,000
7900
8100
8100
5800
7500
7500
5400
*25,300 *25,300 *25,300 *18,400 *18,400 *18,400 *14,100 *14,100 13,300
*7700
*7700
*7700
16,300 15,200 11,000 10,800 10,100
7400
7900
7400
5500 8900 5500 9200 5600
7300
6900
5100
*25,300 *25,300 18,700 *18,400 *18,400 12,200 *14,100 *14,100
*7700
*7700
*7700
0 ft
26.48
17,000 14,600 11,000 11,200
9700
7400
8200
7100
7600
6600
5100
*25,300 *25,300 19,400 *18,400 *18,400 12,600 *14,100 13,500
*7700
*7700
*7700
16,900 15,100 11,100 11,100 10,100
7500
8100
7400
7500
6800
5100
*25,300 *25,300 24,100 *18,400 *18,400 15,300 *14,100 13,900 11,100
*7700
*7700
*7700
*22,800 *22,800 21,300 16,500 16,500 11,500 10,900 10,900 *22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 *17,100 *22,800 *22,800 20,200 16,200 15,100 10,900 10,600 10,000 7300 *22,800 *22,800 *22,800 *23,000 *23,000 18,600 *17,100 *17,100 12,100 7700
8200
8200
5900
*8900
*8900
*8900
8000
7600
5600
*8900
*8900
*8900
–5 ft
24.74
*22,800 *22,800 20,200 16,900 14,500 10,900 11,100
9600
7300
8300
7300
5600
*22,800 *22,800 *22,800 *23,000 *23,000 19,300 *17,100 *17,100 12,500
*8900
*8900
*8900
*22,800 *22,800 20,500 16,800 15,000 11,000 11,000
9900
7400
8300
7500
5700
*22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 15,200
*8900
*8900
*8900
16,700 16,700 11,700 11,100 11,100
7900
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
16,500 15,300 11,100 10,800 10,200
7500
*18,300 *18,300 *18,300 *13,000 *13,000 12,300
–10 ft
17,100 14,700 11,100 11,200
9800
7500
*18,300 *18,300 *18,300 *13,000 *13,000 12,700
17,000 15,200 11,200 11,200 10,100
7600
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
*Limited by hydraulic rather than tipping load. Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface and the Variable Boom Cylinder adjusted to the maximum length. For lifting capacity including bucket and/or quick coupler, the respective weight has to be subtracted from above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance. Always refer to the appropriate Operation and Maintenance Manual for specific product information.
Edition 47 9-57
Made with FlippingBook