Caterpillar Performance Handbook, January 2017, SEBD0351-47
Lifting Capacities ● MH3024 (Grenoble Sourced)
Material Handlers
Lift Capacities All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (11,470 lb), heavy lift on.
Load point height
Load over front
Load over rear
Load over side
Load at maximum reach (sticknose/bucket pin)
Undercarriage
Boom
Stick
MH or Standard
VA
8'2"
10 ft
15 ft
20 ft
25 ft
ft
Undercarriage configuration MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown MH – stabilizers up – solid tires MH – stabilizers down – solid tires Lower (std UC) – f. stabilizer & r. dozer up Lower (std UC) – f. stabilizer & r. dozer down Lower (std UC) – f. dozer & r. stabilizer up Lower (std UC) – f. dozer & r. stabilizer down Lower (std UC) – 2 sets stabilizersup Lower (std UC) – 2 sets stabilizersdown
*8600 *8600 *8600 *8600 *8600 *8600 *8600 *8600 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7000 *7000 *7000 *7000 *7000 *7000 *7000 *7000 *6900 *6900 *6900 *6900 *6900 *6900 *6900 *6900 *7100 *7100 *7100 *7100 *7100 *7100 *7100 *7100 *7700 *7700 *7700 *7700 *7700 *7700 *7700 *7700 *8900 *8900 *8900 *8900 *8900 *8900 *8900 *8900
*8600 *8600 *8600 *8600 *8600 *8600 *8600 *8600 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7000 *7000 *7000 *7000 *7000 *7000 *7000 *7000 *6900 *6900 *6900 *6900 *6900 *6900 *6900 *6900 *7100 *7100 *7100 *7100 *7100 *7100 *7100 *7100 *7700 *7700 *7700 *7700 *7700 *7700 *7700 *8900 *8900 7600
*8600 *8600 *8600 *8600 *8600 *8600 *8600 *8600 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7400 *7000 *7000
18.83
25 ft
14,300 14,300 10,900 *14,800 *14,800 *14,800 14,200 13,400 10,400 *14,800 *14,800 *14,800 14,600 13,000 10,400 *14,800 *14,800 *14,800 14,500 13,300 10,500 *14,800 *14,800 *14,800
20 ft
23.03
*18,900 *18,900 16,300 14,000 14,000 10,500
9800
9800
7400
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*18,900 *18,900 15,700 13,800 13,000 10,100
9600
9100
7000
6700
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
25.56
15 ft
*18,900 *18,900 15,700 14,200 12,600 10,100
9900
8800
7000
6700
9
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
*18,900 *18,900 15,800 14,200 13,000 10,200
9900
9100
7100
6800
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
20,600 20,600 15,000 13,500 13,500 10,000
9600
9600
7200
6400
*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 *13,000
*6900
20,500 19,000 14,400 13,300 12,500
9600
9400
9000
6900
6100
*22,700 *22,700 *22,700 *16,300 *16,300 14,800 *13,000 *13,000 10,600
*6900
10 ft
26.87
21,100 18,400 14,400 13,700 12,100
9600
9800
8600
6900
6100
*22,700 *22,700 *22,700 *16,300 *16,300 15,200 *13,000 *13,000 10,800
*6900
21,000 18,900 14,600 13,600 12,400
9700
9700
8900
6900
6200
*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 12,900
*6900
19,400 19,400 13,900 12,900 12,900
9500
9400
9400
7000
6100
*25,300 *25,300 *25,300 *17,800 *17,800 *17,800 *13,600 *13,600 *13,600
*7100
19,200 17,800 13,300 12,700 11,900
9100
9200
8700
6600
5900
*25,300 *25,300 21,700 *17,800 *17,800 14,200 *13,600 *13,600 10,300
*7100
5 ft
27.17
19,900 17,200 13,300 13,100 11,500
9100
9500
8400
6600
5900
*25,300 *25,300 22,500 *17,800 *17,800 14,600 *13,600 *13,600 10,600
*7100
19,700 17,700 13,500 13,000 11,900
9200
9500
8700
6700
5900
*25,300 *25,300 *25,300 *17,800 *17,800 17,600 *13,600 *13,600 12,600
*7100
18,800 18,800 13,400 12,500 12,500
9100
9200
9200
6800
6300
*25,300 *25,300 *25,300 *18,400 *18,400 *18,400 *14,100 *14,100 *14,100
*7700
18,600 17,300 12,800 12,300 11,600
8700
9000
8500
6500
6000
*25,300 *25,300 21,100 *18,400 *18,400 13,800 *14,100 *14,100 10,100
*7700
0 ft
26.48
19,300 16,700 12,800 12,700 11,200
8700
9300
8200
6500
6000
*25,300 *25,300 21,900 *18,400 *18,400 14,200 *14,100 *14,100 10,400
*7700
19,100 17,200 12,900 12,600 11,500
8800
9300
8500
6500
6100
*25,300 *25,300 *25,300 *18,400 *18,400 17,100 *14,100 *14,100 12,400
*7700
*22,800 *22,800 *22,800 18,700 18,700 13,300 12,400 12,400 *22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 *17,100 *22,800 *22,800 *22,800 18,500 17,200 12,700 12,200 11,400 8600 *22,800 *22,800 *22,800 *23,000 *23,000 21,000 *17,100 *17,100 13,700 *22,800 *22,800 *22,800 19,200 16,600 12,700 12,600 11,000 8600 *22,800 *22,800 *22,800 *23,000 *23,000 21,800 *17,100 *17,100 14,100 *22,800 *22,800 *22,800 19,000 17,100 12,800 12,500 11,400 8700 *22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 17,000 9000
6900
*8900
8700
6600
*8900
*8900
–5 ft
24.74
8400
6600
*8900
*8900
8600
6600
*8900
*8900
*18,300 *18,300 13,500 12,600 12,600
9200
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
*18,300 17,400 12,900 12,400 11,600
8800
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
–10 ft
*18,300 16,800 12,900 12,800 11,200
8800
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
*18,300 17,300 13,100 12,700 11,600
8900
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
*Limited by hydraulic rather than tipping load. Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface and the Variable Boom Cylinder adjusted to the maximum length. For lifting capacity including bucket and/or quick coupler, the respective weight has to be subtracted from above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance. Always refer to the appropriate Operation and Maintenance Manual for specific product information.
Edition 47 9-59