Caterpillar Performance Handbook, January 2017, SEBD0351-47

Production Estimating ● Double Drum and Combi

Vibratory Compactors

Fs = 42 Hz (2520 vpm)/63.3 Hz (3800 vpm) = 0.66 Fi = 33 impacts/m (10 impacts/ft)/46 impacts/m (14 impacts/ft) = 0.71 Ft = 10 cm (4 in)/5 cm (2 in) = 2.0 Fp = 2 passes/4 passes = 0.5 The actual, or adjusted, production estimate can then be determined from the following: Q (actual) = 343 Tonnes/hr (378.6 tons/hr) Notes on Productivity: ● Higher speed usually results in lower density achieved per pass. ● Productivity on uphill slopes may be reduced. ● Tabulated production estimates assume that 1 pass is used for re-positioning the machine at the beginning of the next run. × 0.66 × 0.71 × 2 × 0.5 = 161 Tonnes/hr (177.4 tons/hr)

Example Actual Conditions —A 3.7 m (12 ft) lane is being paved with a compacted asphalt thickness of 10 cm (4 in). A CB54B is operating with a frequency of 42 Hz (2520 vpm) and 46 impacts per meter (14 impacts per ft) and mak- ing 4 passes to achieve target density. The roller is over- lapping its passes 15 cm (6 in) and is overhanging the edges by 7.5 cm (3 in). First, the table gives a CB54B productivity of 343 Tonnes/ hr (378.6 tons/hr) for a 3.7 m (12 ft) paving width. Since the actual vibratory speed, thickness, impact spacing and passes are different from the assumed conditions, the estimate should be adjusted.

Assumed

Actual

63.3 Hz 3800 vpm

42 Hz

Vibratory Speed Impact Spacing

2520 vpm

33 impacts/m 46 impacts/m 10 impacts/ft 14 impacts/ft

5 cm

10 cm

Thickness

2 in

4 in

Passes

2

4

13-44 Edition 47

Made with