5210610S Payroll PPM v1
Work Process Instruction (WPI)
City of Raleigh Public Utilities Department
SUBJECT
NUMBER
REV
EFFECTIVE DATE
Page 10 of 13
Payroll Process Step 3 Checking & Adjusting
WPI.5210 .610.2018.03
1/1/19
SUPERSEDES
PREPARED BY
APPROVED BY:
Timesheets (Weekend)
Thomasina Barnes
9.6.19 Go back to the 1 st PeopleSoft tab (timesheets) 1 st PeopleSoft Tab 9.6.20 From the timesheet, click next employee ( even if no check mark is placed in the box beside the employee’s name on the approver tab )
NOTE: Repeat steps 9.7.15 through 9.7.20 until the entire division is completed. Once the division is complete, move on to step 9.7.21. 9.6.21 When a division is completed; 9.6.21.1 Click on the approved button at the bottom of the approval screen (2 nd PeopleSoft tab)
PRINTED COPIES ARE UNCONTROLLED
33
Made with FlippingBook Online newsletter