Eskom Procurement Book 2015

PURCHASING ANALYSIS TOOLS AND TECHNIQUES

A network diagram also shows all tasks in progress at any given time, as well as the dependencies between outcomes, tasks and events. Network diagrams display individual tasks or events in a graphical manner and aid in planning and estimating project costs; identifying milestones; and categorising task inter- dependencies. The project manager commonly creates network diagrams with detailed input from all team members. Network diagrams are used to show the sequence in which work is performed. In these diagrams, Task A is done before Task B, while Task C is done in parallel with them. The network in the bottom half of Figure 8.4 uses activity-on-arrow notation, in which the arrow represents the work being done and the circle represents an event. An event is binary, i.e., it has either occurred or it has not. An activity, on the other hand, can be partially complete. Note that this is a special use of the word ‘event’. We speak of a football game as an event, even though it spans time. In scheduling terminology, however, an event is a specific point in time where something has just started or has just been finished. The advantage of using CPM or PERT techniques is that they allow one to predict if it is possible to meet an important project completion date and when various tasks must be finished in order to meet that deadline. Further, one can tell which tasks have some leeway and which do not. In fact, both CPM and PERT determine the location of the critical path (the longest series of activities that can’t be done in parallel) and thus govern how early the project can be completed [4]. Below are the most commonly used network terms: • Activity: An activity always consumes time and may also consume resources. Examples include paperwork, labour, negotiations, machinery operations and lead times for purchased parts or equipment. • Critical: An activity or event that must be achieved by a certain time, having no latitude (slack or float) whatsoever. • Critical path: The critical path is the longest path through a network and determines the earliest completion of project work. • Event: Beginning and ending points of activities are known as events. An event is a specific point in time. Events are commonly denoted graphically by a circle and may carry identity nomenclature (words, numbers, alpha- numeric codes, etc.). • Float: The amount of time that a task can slip without delaying the project. Another term commonly used for float is slack. • Milestone: An event that represents a point in a project of special significance, usually the completion of a major phase of the work. A project review is often conducted at that time. • Network: Networks are called arrow diagrams. They provide a graphical representation of a project plan showing the relationships of the activities [4].

8.6.3 DEFINITIONS OF NETWORK TERMS

186 CHAPTER 8

Made with