Oil & Gas UK Economic Report 2014

Figure 37: Quad204 Subsea Infrastructure

1

FW14 (Phase1)

LW14 (Future)

LOYALDRILLCENTRE (INCLUDINGSOUTHLOYAL)

F124

LP07

M122

FW12

LW10

LP11 (Phase1)

LP13 (Phase1)

M45

ProposedGas ProposedUmbilical ProposedProduction ProposedWater Injection ProposedCOCOTFTP ExistingGas ExistingUmbilical ExistingProduction ExistingWater Injection

CDA C38

FW11

C122R

M121

2

ControlUmbilicalU4

FW13 (Phase1)

F123

LP12 (Phase1)

LW04A

F122R

U123

FP05 (Phase1)

U40

FP06 (Phase1)

LW05

FP03 (Future)

FP07 (Future)

M44

F122

M43

LW15 (Phase1)

NORTHWESTDRILLCENTRE

F121

LP01

FP02

CDAC31

LW06

LP02

M42

C121

LP03

M41

F45

10”Production ‘A’FlowlineL122RReplacement

8”GasLiftFlowlineL121

12”Water InjectionFlowlineL124 10”ProductionFlowlineL123

10”Water InjectionFlowlineL45

FPSO

UETU14

F44

F41

F42R

F43R

F42

L43Replacement

F43

StaticUmbilicalU9

UETU26

ControlUmbilicalU22

UETU19

UETU16

StaticUmbilicalU18

F65

3

10”ProductionFlowlineL44

U41

6”GasLiftFlowlineL41

UETU17

F132R

F54

8”Production/TestFlowlineL42R Replacement 10”ProductionFlowlineL43 8”Production/TestFlowlineL42

F133

UET U32

DUTAD40

NW03

F134

UETU35

CDAC30

F131

NW02

10”Water InjectionFlowlineL61

10”ProductionFlowlineL43R

M61

10”Production ‘A’FlowlineL122

NW04 (Phase1)

F132

U50

UET U133

M32

DUTAD30

SSIV1

UETU24

NW01

N-1G

F52R

UET U13

F61

F53R

M134

DynamicUmbilicalN -7U

N-4P

SSIV2

N-2G

F71

RT132

N-3PT

UET U27

RT54

NORTHDRILLCENTRE

DynamicUmbilicalW-2U

W-7P

F36

ControlUmbilicalU5

N-5P

W-5P

RT133

N-6W N-7U

StaticUmbilicalU28

N-3PT

M71

N-6U

W-2U

M132

PT54

F51

F11

S-6W

E-1P

S-7P

E-3PT

4

RT17

F35

U31

E-4P

RT38

F17

S-4PT

E-5P

F38

S-5P

RT137

S-3P

E-6W E-7P

CentralUmbilicalU34

F12R

F13R

S-2P

F7

U60R

F1

S-1G

F14R

F33R

F34R

F135

F12

F2R

F15R

F13

L28

F14

F16

10”ProductionFlowlineL7

F34

F2

F15

8”GasLiftFlowlineL1 8”Production/TestFlowlineL2R Replacement

SSIV3

F37R

F33

10”Production ‘A’FlowlineL4

UET U29

F3

M31

10”Production ‘A’FlowlineL4R Replacement 10”Production ‘C’FlowlineL5 10”Production ‘C’FlowlineL5R Replacement

F3R

10”Production ‘B’FlowlineL3 8”Production/TestFlowlineL2

12”Water InjectionFlowlineL28

RT19

12”Water InjectionFlowlineL6

UETU33

M1J

CP26 (Future)

F31

10”ProductionFlowlineL3RReplacement

F37

M1C

CP07

CDA C34

10”ProductionFlowlineL24R Replacement 8”Production/TestFlowlineL23R

F29

WW16

ControlUmbilicalU11

10”Production/TestFlowlineL125

ControlUmbilicalU3 10”ProductionFlowlineL27R Replacement

CP22

CP23

ToEOR

6”GasLiftFlowlineL25

F8

10”Water InjectionFlowlineL26 F27R

M1B

F4

WW11

F19

CP04

F4R

CP05

F26

M1F

F5

F5R

WW04

M8

F82

F6

CP03

M22

CP08

CP06

WW05

M1A/C1A

F25

CDAC35

F81

5

M1/C1

CP09

F27

10”ProductionFlowlineL27

WW08

F18

U12

C1PR

M22A

WW06

M25

F9

MooringLines (TYP)

F24R

WW09

10”ProductionFlowlineL24 F23

CP02

M1D

WP03

U30

F24

8”Production/TestFlowlineL23

C21R

CW12

M1X

F23R

C22

C24

WW10

F125

10”ProductionFlowlineL9

M21

WW19 (Phase1)

WP02

8”GasLift /ExportFlowlineL8

C33

U30

WP01

WW12

U23

CP14

CW13

8”GasDisposalFlowlineL21

CW27 (Future)

CENTRALDRILLCENTRE

C25

CP20

WW17 (Phase1)

CW11

U21

WP23 (Future)

M24

CP21

CP25 (Future)

WP20 (Future)

WP07

WW18 (Future)

CW17

WP13

CW16

WP24 (Phase1)

M2

WP14

CP01

WP21 (Phase1)

WESTDRILLCENTRE

WP22 (Future)

CP24 (Future)

FaroesFibre OpticSystem

WP25 (Phase1)

CW19

CW10

CDA C37

M2A

CW15

B1R

FibreOpticCable

CW18

ControlUmbilicalU30

M125

ToGasDisposalWellNotConnected ControlUmbilicalU2

C27

FibreOpticCable

ControlUmbilicalU10

6

Gas fromFoinaven 10”GasFlowlineL81

ToGasDisposalWell

Producedby JPKennyCaledoniaLtd Date /21-08-12 O\Graphics\drgno.FLD175

Source: BP

PROJECT

TITLE

OFFICE

PROJECT.N0

SCALE N/A

QUAD204

06 2960.06

A1 B1 B2

26/01/2012 04/10/2012 29/05/2013

Issued forCOMPANYReview Approved forDesign Re-approved forDesign

JB

TH JS MO HB CB RS AD IA AS RS DS

Quad204FieldLayout

CLIENT

AW AW

BPExplorationOperating CompanyLtd.

DRAWINGNUMBER

B2 REV.

QD-JP-PL-GAS-0006-01

REV

DATE

BY CHK ENG PM CLIENT

BP and its joint venture partners are now investing £3 billion to redevelop the greater Schiehallion field area – a project known as Quad204. This includes a new, state-of-the-art FPSO, world-leading subsea technology, with extensive seabed infrastructure, and plans for an innovative polymer-based EOR scheme. The addition of 25 new wells will help the fields to deliver on the promise of a billion barrels in total. Subsea infrastructure contracts worth over £1 billion have been awarded to suppliers in the UK, from Lerwick on the Shetland Islands to London, withmajor works being undertaken in Aberdeen, Leeds and Merseyside. The new FPSO, named Glen Lyon, will be bigger and more sophisticated than its predecessor, with storage capacity in excess of one million barrels of oil. Its turret alone will weigh

10,000 tonnes and will be one of the most complex ever built. To cope with the tough challenge WoS, a new semi-submersible drilling rig is also being built. BP has contracted Deepsea Aberdeen for a minimum of seven years to drill in the Schiehallion and Loyal fields. BP is also investing in additional state-of-the-art spill handling facilities to enhance emergency response, including the purchaseof twonewskimming systems and the upgradeof itssupportvessel provisionforuse in the area. When Quad204’s redevelopment project comes on-stream, it will mark a new era for the Schiehallion and Loyal fields and will contribute to Britain’s and Europe’s energy supply for many years to come.

7

8

67

ECONOMIC REPORT 2014

Made with FlippingBook - professional solution for displaying marketing and sales documents online