ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

TRA-N-298

Rehabilitation, Modernization and Expansion of the National Transmission System

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Public Financing

Bulgartransgaz EAD

Project of Common Interest

TEN-E Project ?

Operator

Private Financing

Bulgartransgaz EAD

Yes

In PCI list ?

Multilateral Financing

None

IGAs

Web Link

http://www.bulgartransgaz.bg/en/index.php

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Not applicable

Considered Tariff Regime

FID

Total Pipeline Length (km)

Not applicable

2015

Applied for Exemption ?

Construction

Total Compressor Power (MW)

Not relevant

Exemption granted ?

Commissioning

Expected Load Factor

Not relevant

2017

% Exemption in entry direction

Last completed Phase :

Diameter (range) (mm)

% Exemption in exit direction

Diameter (range) (inches)

Southern Corridor GRIP 2014–2023 Annex B |

112

ENTSOG TYNDP 2013-2013 - Annex A