ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

PROJECTED CAPACITY INCREASES Interconnection

Capacity (GWh/d)

From Zone

To Zone

Modelled Direction

DESCRIPTION OF THE PROJECT

A set of activities involving rehabilitation, modernisation and expansion of the existing national gas transmission infrastructure with a view to guaranteeing the possibility of the national gas transmission system to ensure the transport of sufficient natural gas volumes through the territory of the country using the planned new interconnections to other countries from the region of South Eastern, Central and Eastern Europe and in the context of the large cross-border gas projects in the region. The project mostly include compressor stations modernisation (CS Valchi Dol and CS Polski Senovets) as well as in-line inspections, complete overhauls and replacement of gas pipeline sections of the main gas pipelines that are part of the annularly built gas transmission system and construction regulating lines at the exits of gas pipeline branches off the main and transit gas pipeline to enhance its reliability, security and capacity.

EXPECTED BENEFITS

Security of Supply, Market integration, Reverse Flows, Diversification of sources, Diversification of routes, N-1 National, N-1 Regional (Central and Eastern Europe, South Eastern Europe, Balkan Region), The modernisation, rehabilitation and expansion of the existing gas transmission network are directly linked to the planned new interconnections with Greece (IGB), Romania (IBR), Turkey (ITB) and Serbia (IBS), the integration of the national and the transit gas transmission system on the territory of Bulgaria and the development of the large cross-border gas projects in the region. The efficient use of the new entry and exit points from/to Bulgartransgaz gas transmission networks is directly linked to the technical possibilities of the existing gas transmission infrastructure on the territory of Bulgaria to ensure sufficient capacity and suitable technical conditions to accommodate the transport of the planned new natural gas quantities and to the available storage capacity and the expansion of the gas storage facility in Chiren unique on the territory of the country.

COMMENTS ABOUT THE PROJECT FINANCING Public financing

Private financing

Multilateral financing

Southern Corridor GRIP 2014–2023 Annex B |

113