ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
Interconnection Croatia-Bosnia & Herzegovina (South)
TRA-N-302
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
Public Financing
Plinacro Ltd
Not part of TEN-E
TEN-E Project ?
–
Operator
Private Financing
Plinacro Ltd
No
In PCI list ?
–
Multilateral Financing
None
IGAs
–
Web Link
www.plinacro.hr
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Considered TPA Regime
End of permitting phase
# of Pipelines, nodes, CS
Regulated
3
Considered Tariff Regime
FID
Total Pipeline Length (km)
Regulated
+29.00
Applied for Exemption ?
Construction
Total Compressor Power (MW)
No
Exemption granted ?
Commissioning
Expected Load Factor
No
2018
% Exemption in entry direction
Last completed Phase :
Diameter (range) (mm)
–
Planned
DN 500
% Exemption in exit direction
Diameter (range) (inches)
–
20"
Southern Corridor GRIP 2014–2023 Annex B |
114