ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

Interconnection Croatia-Bosnia & Herzegovina (South)

TRA-N-302

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Public Financing

Plinacro Ltd

Not part of TEN-E

TEN-E Project ?

Operator

Private Financing

Plinacro Ltd

No

In PCI list ?

Multilateral Financing

None

IGAs

Web Link

www.plinacro.hr

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

3

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

+29.00

Applied for Exemption ?

Construction

Total Compressor Power (MW)

No

Exemption granted ?

Commissioning

Expected Load Factor

No

2018

% Exemption in entry direction

Last completed Phase :

Diameter (range) (mm)

Planned

DN 500

% Exemption in exit direction

Diameter (range) (inches)

20"

Southern Corridor GRIP 2014–2023 Annex B |

114

ENTSOG TYNDP 2013-2013 - Annex A

Made with