ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

TRA-N-325

Slovenian-Hungarian interconnector

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Public Financing

FGSZ Natural Gas Transmission

Not part of TEN-E

TEN-E Project ?

Operator

Private Financing

FGSZ Natural Gas Transmission

Yes

In PCI list ?

100%

Multilateral Financing

None

IGAs

Web Link

www.fgsz.hu

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

2016 Q3

1

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

2015 Q2

+41.00

Applied for Exemption ?

Construction

Total Compressor Power (MW)

No

2016 Q3

+7.50

Exemption granted ?

Commissioning

Expected Load Factor

No

2017 Q4

% Exemption in entry direction

Last completed Phase :

Diameter (range) (mm)

Planned

DN 500

% Exemption in exit direction

Diameter (range) (inches)

20"

Southern Corridor GRIP 2014–2023 Annex B |

118

ENTSOG TYNDP 2013-2013 - Annex A

Made with