ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
Plinovodi projects cluster 4
Code
Name
Commissioning
Technical information
FID status
TEN-E
PCI project
non-FID non-FID non-FID non-FID non-FID
2017 2017 2017 2023 2023
TEN-E 2011 TEN-E 2011 TEN-E 2011
Yes Yes Yes No Yes
M3/1a Gorizia/Šempeter - Ajdovščina
Pipeline 24 km Pipeline 47 km Pipeline 29 km
TRA-N-099 TRA-N-262 TRA-N-261 TRA-N-093 TRA-N-101
M3/1b Ajdovščina - Kalce
M3/1c Kalce - Vodice
CS Ajdovščina (2nd phase)
Compressor station 20 MW
Not part of TEN-E
M8 Kalce - Jelšane
Pipeline 51 km
TEN-E 2012
GENERAL INFORMATION
Operator Promoter
THIRD-PARTY ACCESS REGIME
Plinovodi Plinovodi
Considered TPA Regime
Negotiated with the exception of the CS Ajdovščina Negotiated with the exception of the CS Ajdovščina
Considered Tariff Regime
Applied for Exemption ?
Not yet
Web Link
www.plinovodi.si/wp-content/uploads/2011/09/RN-2014-2023.pdf
DESCRIPTION AND BENEFITS OF THE PROJECT
These projects aim at providing the necessary capacity to the Slovenian transmission system for the transportation of gas delivered either from the planned Krk terminal in Croatia or through the planned IAP pipeline, to Slovenia and Italy. The cross-border capacity at Šempeter/Gorizia would increase by 102 GWh/d or (with the addition of the 2nd phase C/S) by 340 GWh/d. Their implementation depends on the implementation of either of the above upstream projects.
Southern Corridor GRIP 2014–2023 Annex B |