ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

Plinovodi projects cluster 4

Code

Name

Commissioning

Technical information

FID status

TEN-E

PCI project

non-FID non-FID non-FID non-FID non-FID

2017 2017 2017 2023 2023

TEN-E 2011 TEN-E 2011 TEN-E 2011

Yes Yes Yes No Yes

M3/1a Gorizia/Šempeter - Ajdovščina

Pipeline 24 km Pipeline 47 km Pipeline 29 km

TRA-N-099 TRA-N-262 TRA-N-261 TRA-N-093 TRA-N-101

M3/1b Ajdovščina - Kalce

M3/1c Kalce - Vodice

CS Ajdovščina (2nd phase)

Compressor station 20 MW

Not part of TEN-E

M8 Kalce - Jelšane

Pipeline 51 km

TEN-E 2012

GENERAL INFORMATION

Operator Promoter

THIRD-PARTY ACCESS REGIME

Plinovodi Plinovodi

Considered TPA Regime

Negotiated with the exception of the CS Ajdovščina Negotiated with the exception of the CS Ajdovščina

Considered Tariff Regime

Applied for Exemption ?

Not yet

Web Link

www.plinovodi.si/wp-content/uploads/2011/09/RN-2014-2023.pdf

DESCRIPTION AND BENEFITS OF THE PROJECT

These projects aim at providing the necessary capacity to the Slovenian transmission system for the transportation of gas delivered either from the planned Krk terminal in Croatia or through the planned IAP pipeline, to Slovenia and Italy. The cross-border capacity at Šempeter/Gorizia would increase by 102 GWh/d or (with the addition of the 2nd phase C/S) by 340 GWh/d. Their implementation depends on the implementation of either of the above upstream projects.

Southern Corridor GRIP 2014–2023 Annex B |

123