ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

TRA-F-016

Slovakia - Hungary interconnection

FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Public Financing

eustream, a.s.

Not part of TEN-E

TEN-E Project ?

16%

Operator

Private Financing

eustream, a.s.

Yes

In PCI list?

84%

Multilateral Financing

1

IGAs

www.eustream.sk/en_transmission-system/en_sk-hu- interconnector

Web Link

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

2012 Q1

1

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

2010 Q1

+18.00

Applied for Exemption ?

Construction

Total Compressor Power (MW)

No

2012 Q2

Exemption granted ?

Commissioning

Expected Load Factor

No

2015 Q1

+0.80

% Exemption in entry direction

Last completed Phase :

Diameter (range) (mm)

FID

DN 800

% Exemption in exit direction

Diameter (range) (inches)

32"

Southern Corridor GRIP 2014–2023 Annex B |