ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
TRA-F-016
Slovakia - Hungary interconnection
FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
Public Financing
eustream, a.s.
Not part of TEN-E
TEN-E Project ?
16%
Operator
Private Financing
eustream, a.s.
Yes
In PCI list?
84%
Multilateral Financing
1
IGAs
–
www.eustream.sk/en_transmission-system/en_sk-hu- interconnector
Web Link
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Considered TPA Regime
End of permitting phase
# of Pipelines, nodes, CS
Regulated
2012 Q1
1
Considered Tariff Regime
FID
Total Pipeline Length (km)
Regulated
2010 Q1
+18.00
Applied for Exemption ?
Construction
Total Compressor Power (MW)
No
2012 Q2
Exemption granted ?
Commissioning
Expected Load Factor
No
2015 Q1
+0.80
% Exemption in entry direction
Last completed Phase :
Diameter (range) (mm)
–
FID
DN 800
% Exemption in exit direction
Diameter (range) (inches)
–
32"
Southern Corridor GRIP 2014–2023 Annex B |
23
ENTSOG TYNDP 2013-2013 - Annex A