ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

Reverse flow at Negru Voda

TRA-F-142

FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator

Private Financing Public Financing Multilateral Financing

Not part of TEN-E No

Transgaz Transgaz

TEN-E Project ?

50%

In PCI list ?

50%

None

IGAs

Web Link

www.transgaz.ro

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

End of permitting phase

# of Pipelines, nodes, CS Total Pipeline Length (km) Total Compressor Power (MW) Expected Load Factor

Considered TPA Regime Considered Tariff Regime Applied for Exemption ? Exemption granted ?

1

Regulated Regulated

FID Construction Commissioning Last completed Phase :

2010

No

Not relevant

2013

% Exemption in entry direction % Exemption in exit direction

Diameter (range) (mm) Diameter (range) (inches)

Commissioning

Southern Corridor GRIP 2014–2023 Annex B |

31

ENTSOG TYNDP 2013-2013 - Annex A

Made with