ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
Reverse flow at Negru Voda
TRA-F-142
FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator
Private Financing Public Financing Multilateral Financing
Not part of TEN-E No
Transgaz Transgaz
TEN-E Project ?
50%
In PCI list ?
50%
None
IGAs
–
Web Link
www.transgaz.ro
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km) Total Compressor Power (MW) Expected Load Factor
Considered TPA Regime Considered Tariff Regime Applied for Exemption ? Exemption granted ?
1
Regulated Regulated
FID Construction Commissioning Last completed Phase :
2010
No
Not relevant
2013
% Exemption in entry direction % Exemption in exit direction
Diameter (range) (mm) Diameter (range) (inches)
–
Commissioning
–