ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

TRA-N-007

Development for new imports from the South (Adriatica Line)

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Public Financing

Snam Rete Gas S.p.A.

Not part of TEN-E

TEN-E Project ?

Operator

Private Financing

Snam Rete Gas S.p.A.

Yes

In PCI list ?

Multilateral Financing

None

IGAs

http://www.snamretegas.it/en/services/Thermal_Year_2 013_2014/Ten-year-Plan/index.html

Web Link

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

1

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

+430

Applied for Exemption ?

Construction

Total Compressor Power (MW)

No

+33.00

Exemption granted ?

Commissioning

Expected Load Factor

Not relevant

2019

+0.65

% Exemption in entry direction

Last completed Phase :

Diameter (range) (mm)

Planned

DN 1200

% Exemption in exit direction

Diameter (range) (inches)

48"

Southern Corridor GRIP 2014–2023 Annex B |

42

ENTSOG TYNDP 2013-2013 - Annex A

Made with