ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
TRA-N-061
Ercsi-Szazhalombatta
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
Public Financing
FGSZ Ltd.
Not part of TEN-E
TEN-E Project ?
–
Operator
Private Financing
FGSZ Ltd.
Yes
In PCI list ?
100%
Multilateral Financing
None
IGAs
–
Web Link
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Considered TPA Regime
End of permitting phase
# of Pipelines, nodes, CS
Regulated
2022 Q3
1
Considered Tariff Regime
FID
Total Pipeline Length (km)
Regulated
2021 Q2
+11.00
Applied for Exemption ?
Construction
Total Compressor Power (MW)
No
2022 Q2
Exemption granted ?
Commissioning
Expected Load Factor
No
2023 Q4
% Exemption in entry direction
Last completed Phase :
Diameter (range) (mm)
–
Planned
DN 800
% Exemption in exit direction
Diameter (range) (inches)
–
32"
Southern Corridor GRIP 2014–2023 Annex B |
66
ENTSOG TYNDP 2013-2013 - Annex A