ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

TRA-N-061

Ercsi-Szazhalombatta

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Public Financing

FGSZ Ltd.

Not part of TEN-E

TEN-E Project ?

Operator

Private Financing

FGSZ Ltd.

Yes

In PCI list ?

100%

Multilateral Financing

None

IGAs

Web Link

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

2022 Q3

1

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

2021 Q2

+11.00

Applied for Exemption ?

Construction

Total Compressor Power (MW)

No

2022 Q2

Exemption granted ?

Commissioning

Expected Load Factor

No

2023 Q4

% Exemption in entry direction

Last completed Phase :

Diameter (range) (mm)

Planned

DN 800

% Exemption in exit direction

Diameter (range) (inches)

32"