ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

TRA-N-063

Alexandroupolis Independent Natural Gas System - Pipeline Section

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Public Financing

Gastrade S.A.

Project of Common Interest

TEN-E Project ?

30%

Operator

Private Financing

Gastrade S.A.

Yes

In PCI list?

70%

Multilateral Financing

None

IGAs

Web Link

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

2014 Q2

1

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

2014 Q4

+29.00

Applied for Exemption ?

Construction

Total Compressor Power (MW)

No

2015 Q1

Exemption granted ?

Commissioning

Expected Load Factor

Not relevant

2016 Q2

+0.30

% Exemption in entry direction

Last completed Phase :

Diameter (range) (mm)

Planned

DN 750

% Exemption in exit direction

Diameter (range) (inches)

30"

Southern Corridor GRIP 2014–2023 Annex B |

68

ENTSOG TYNDP 2013-2013 - Annex A

Made with