ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
Interconnection Croatia/Bosnia & Herzegovina (Slobodnica- Bosanski Brod-Zenica)
TRA-N-066
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
Public Financing
Plinacro Ltd
Not part of TEN-E
TEN-E Project ?
–
Operator
Private Financing
Plinacro Ltd
No
In PCI list ?
–
Multilateral Financing
2
IGAs
–
Web Link
www.plinacro.hr
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Considered TPA Regime
End of permitting phase
# of Pipelines, nodes, CS
Regulated
1
Considered Tariff Regime
FID
Total Pipeline Length (km)
Regulated
+6.00
Applied for Exemption ?
Construction
Total Compressor Power (MW)
No
2018
Exemption granted ?
Commissioning
Expected Load Factor
No
2019
+0.90
% Exemption in entry direction
Last completed Phase :
Diameter (range) (mm)
–
Planned
DN 700
% Exemption in exit direction
Diameter (range) (inches)
–
28"
Southern Corridor GRIP 2014–2023 Annex B |
70
ENTSOG TYNDP 2013-2013 - Annex A