ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
TRA-N-140
Interconnection Turkey-Bulgaria
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
Public Financing
Bulgartransgaz EAD
Project of Common Interest
TEN-E Project ?
–
Operator
Private Financing
Bulgartransgaz EAD
Yes
In PCI list ?
–
Multilateral Financing
2
IGAs
–
Web Link
http://www.bulgartransgaz.bg/en/index.php
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Considered TPA Regime
End of permitting phase
# of Pipelines, nodes, CS
Not applicable
2
Considered Tariff Regime
FID
Total Pipeline Length (km)
Not applicable
+205
Applied for Exemption ?
Construction
Total Compressor Power (MW)
Not relevant
Exemption granted ?
Commissioning
Expected Load Factor
Not relevant
2016
% Exemption in entry direction
Last completed Phase :
Diameter (range) (mm)
–
Planned
DN 1000
% Exemption in exit direction
Diameter (range) (inches)
–
40"
Southern Corridor GRIP 2014–2023 Annex B |
94