ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Interconnector ITB (Turkey - Bulgaria) PROJECTED CAPACITY INCREASES Interconnection

Capacity (GWh/d)

From Zone

To Zone

Modelled Direction Yes entry

92.00

Hub Turkey (Imports)

Hub Bulgaria

DESCRIPTION OF THE PROJECT

The interconnection is foreseen to be built as a development to the existing connection of Bulgartransgaz EAD and Botas S.А. – Turkey systems by creating the technical opportunity for enabling bi-directional physical flow of natural gas between both systems. Thus a significantly greater security of gas supply to Bulgaria can be achieved, meeting the N-1 security standard and diversification of natural gas supply sources. P reliminary plans are for a staged project development. Currently design activities for the 20 km pipeline section, from CS Lozenets to Nedialsko are underway.

EXPECTED BENEFITS

Security of Supply, Market integration, Reverse Flows, Diversification of sources, Diversification of routes, N-1 National, N-1 Regional (Central and Eastern Europe, South Eastern Europe, Balkan Region), The interconnection Turkey- Bulgaria is a key project whose realization shall lead to the increase of the security of supply and the opportunity for diversification of gas supply not only to Bulgaria, but to the Central and South-Eastern Europe region as well. The project contributes directly to the diversification of gas sources: alternative gas producers - countries from the Caspian region, Turkish LNG terminals and Middle East.

COMMENTS ABOUT THE PROJECT FINANCING Public financing

Private financing

Multilateral financing

Southern Corridor GRIP 2014–2023 Annex B |

95

SOUTHERN CORRIDOR GRIP 2014-2023 - Annex A

Made with