Brochure Hose Industry - High Pressure - English

Hose Pressure Testing Hose pressure testing procedures involve many small steps. The process begins with the transportation of the hose, goes over into the test phase, and ends with dismantling the hose. In total, we divide the hose pressure testing phase into eight single steps: Transport, mounting, prefilling & de-airing, pressure build-up, stabilization time, isolation/test phase, pressure relief/bleeding, and dismantling. The generation of a certificate is the result of a hose pressure test. The certificate shows whether the hose has met predefined quality standards, or not. A detailed report provides precise information about the period between the pressure build-up and relief. This process can be done manually but automated solutions provide time savings and reduce operator errors. Hose Certification Regular maintenance and calibration of the hose test benches is necessary to keep up the life-and uptime of the unit. Depending on the usage rate and utilized pressures, it is advised to perform maintenance and calibration activities once a year. Maintenance & Calibration

9

HOSE INDUSTRY

www.resato.com

Made with FlippingBook - professional solution for displaying marketing and sales documents online