ENTSOG Annual Report 2014
Implementation and Monitoring of New Regulations
The following sections describe how the network codes and guidelines are implemented and monitored in addition to the implementation of additional relevant EU Regulations.
MONITORING THE CMP NETWORK CODE
As stipulated by article 8 (8) of the Gas Regula- tion, ENTSOG monitors the implementation of the Congestion Management Procedures (CMP). CMP was developed by the European Commission from 2010–2011, approved by the EU Gas Committee on 24 August 2012, and im- plemented on 1 October 2013.
ENTSOG launched the monitoring process in November 2014 to ensure the timely publication of results in Annual Report 2014. Since ACER’s detailed CMP implementation monitoring report was already published in January 2015, ENTSOG chose a less complex method of self- assessment for Transmission System Operators (TSOs). The aggregated results are shown below.
Overview of Implementation status
OVERSUBSCRIPTION AND BUY-BACK SCHEME OR FIRM DAY-AHEAD UIOLI MECHANISM 1)
NUMBER OF TSOs
ADDITIONAL CAPACITY BY CMP MEASURES
SURRENDER OF CONTRACTED CAPACITY
LONG-TERM UIOLI
COMMENTS
Including exemption as per NRA decision under point 2.2.3(6) 1)
29
LT UIOLI: delayed implemen tation in accordance with NRA
1
OS+BB: The NRA has not ap- proved the proposed scheme yet
1
3
OS+BB: implementation in 2015
OS+BB + SoC: implementation in 2015 OS+BB + LT UIOLI: implementation in 2015 OS+BB + SoC + LT UIOLI: implementation in 2015
1
1
3
8
Implemented In process of implementation (NRA decision pending) Not applicable, as regards scope, implementation date or derogation under Article 49 of Gas Directive
Not implemented
1) The firm day-ahead UIOLI mechanism should be implemented by 1 July 2016, where ACER’s congestion monitoring report shows that there is excessive demand for firm capacity products offered in the next three years or where no firm capacity is offered at all
ENTSOG Annual Report 2014 |
43