neocube Operating and installation instructions - models P/C
Moving the heating insert to the site of installation
Before installing or positioning the heating element at the site of installation, all preli- minary work must have been completed: This includes: Chimney connection
1
Carefully unpack the heating insert and transport to the site of installation.
Combustion air connection Removing the skirting boards
Hint: As an option you can put the provided pro- tection caps on the adjusting feet. They are more gentle for the floor.
2
3
Rear flue pipe outlet (Ø 150 mm)
Transport safety
If the flue pipe outlet is at the rear, remove the pre-perforated metal plate on the rear wall.
The door weights are secured inside the heating insert with cable ties. These must be removed.
neocube P / C – Operating and installation instructions
15
Made with FlippingBook flipbook maker