Word 2016 Intermediate/Advanced

Word 2016

Lesson 7 – Working with Comments and Revisions

Practice Data

Steps

4. To skip a tracked change or comment without accepting or rejecting it, select the Next button in the Changes group. The revision marks and markup balloon remain in the document and the next tracked change or comment is selected. 5. To accept a tracked change, select the Accept button in the Changes group. The tracked change is accepted, the revision marks and markup balloon are removed from the document, and the next tracked change or comment is selected. Reject button in the Changes group. The tracked change is rejected, the revision marks and markup balloon are removed from the document, and the next tracked change or comment is selected 6. To reject a tracked change, select

Click

Click

twice

Click

Follow the instructions below the table to complete this step

7. Continue accepting or rejecting changes as desired.

The changes are accepted or rejected accordingly.

Reject the next two changes (In addition) and (Deleted: For items not produced by Worldwide Sporting Goods).

Click the Balloons button and select Show All Revisions Inline . Notice that the markup balloons are hidden from view.

Click the left-hand part of the Reviewing Pane button to display the Reviewing Pane.

Accept the next four changes (Inserted: top), (Deleted: first-), (Inserted: manufacturers of sporting goods.) and (Deleted: Sporting Goods Manufacturers.). Notice that as changes are accepted they are also removed from the Reviewing Pane.

Click the left-hand part of the Reviewing Pane button to hide the Reviewing Pane.

OFFICEPRO, Inc.

Page 153

Made with FlippingBook flipbook maker