2027-31 Capital Improvement Plan

Project Details Report Arbor Bluff Stream Stabilization and Regional Pond Project Name Arbor Bluff Stream Stabilization and Regional Pond Project # Storm-25-002

Total Project Cost $750,000

City Engineer Improvement 2 - Smart to do

Contact

Storm Drainage Fund Storm Sewer/Drainage

Department

Type

Category

Priority

Active

Surface Water Fund

Status

Fund

Description

Phase 1 of this project includes restoration to the Blue Lake Channel tributary within the bluff adjacent to the Arbor Bluff development. The steep section within the bluff is experiencing erosion and needs to be restored and stabilized. This project is in coordination with the adjacent residential development and trail improvements which are planned to be constructed prior to completing the development.

Phase 2 is a regional best management practice located west of CSAH 83 to implement for rate control, flood protection, and water quality. The timing of this phase is dependent on development.

Justification

It is important to restore and stabilize the channel to protect adjacent infrastructure and property. The regional best management practice is important to control rates to manage the stormwater system and protect or reduce the potential for flooding in the downstream stormwater system. These projects also provide water quality benefit by reducing sediment and phosphorus to help meet water quality goals and NPDES MS4 requirements.

Expenditures

2027

2028

2029

2030

2031

Total

Construction/Maintenance

675,000

0 0

0 0

0 0

0 0

675,000

Engineering/Administration

75,000

75,000

750,000

0

0

0

0

750,000

Total

Funding Sources

2027

2028

2029

2030

2031

Total

Storm Drainage Fund

750,000

0

0

0

0

750,000

750,000

0

0

0

0

750,000

Total

Budget Impact

Restoration and construction for this project would be coordinated with the timing of adjacent development. A feasibility study that evaluated flooding was completed by WSB in 2014. An AUAR was completed by Stantec for this area. A feasibility study by Stantec partially funded through Watershed Based Implementation Funding was completed to determine if there is a water quality benefit opportunity with oversizing. The study did identify that there are opportunities for water quality benefits with the regional system to be incorporated with development.

Produced Using Plan-It CIP Software

236

Made with FlippingBook flipbook maker