2027-31 Capital Improvement Plan

Public Works Surface Water: Skidsteer Track Loader Project Name Public Works Surface Water: Skidsteer Track Loader Project # Storm-27-003

Total Project Cost $54,600

Public Works Director

Contact

Storm Drainage Fund

Equipment

Department

Type

Vehicles

2 - Smart to do

Category

Priority

Active

1 year

Status

Useful Life

Surface Water Fund

SK1534

Fund

2027 Replace Vehicle # 2029 Replace Vehicle # 2031 Replace Vehicle #

Replace 2027 Model

Replace 2028 Model

2028 Replace Vehicle # 2030 Replace Vehicle #

Replace 2029 Model

Replace 2030 Model

Description

2027: Replace CAT 289DW Skidsteer Track Loader SK1534

2028: Replace CAT 289DW Skidsteer Track Loader from 2027

2029: Replace CAT 289DW Skidsteer Track Loader from 2028

2030: Replace CAT 289DW Skidsteer Track Loader from 2029

2031: Replace CAT 289DW Skidsteer Track Loader from 2030

Justification

The 1-year annual purchase option provides a cost-effective solution by reducing overall maintenance expenses and downtime, while ensuring continuous warranty coverage throughout the service period.

Expenditures

2027

2028

2029

2030

2031

Total

Equip/Vehicles/Furnishings

10,400

10,700

10,900

11,200

11,400

54,600

10,400

10,700

10,900

11,200

11,400

54,600

Total

Funding Sources

2027

2028

2029

2030

2031

Total

Storm Drainage Fund

10,400

10,700

10,900

11,200

11,400

54,600

10,400

10,700

10,900

11,200

11,400

54,600

Total

Produced Using Plan-It CIP Software

240

Made with FlippingBook flipbook maker