2027-31 Capital Improvement Plan

West End Regional Pond and Trunk Oversizing Project Name West End Regional Pond and Trunk Oversizing Project # Storm-27-006

Total Project Cost $450,000

City Engineer Improvement 2 - Smart to do

Contact

Storm Drainage Fund Storm Sewer/Drainage

Department

Type

Category

Priority

Active

Surface Water Fund

Status

Fund

Description Oversizing of ponds and storm sewer for managing offsite stormwater runoff that will be coordinated with development.

Justification It is important to control rates to manage the stormwater system and protect/reduce the potential for flooding in the downstream stormwater system.

Expenditures

2027

2028

2029

2030

2031

Total

Construction/Maintenance

400,000

0 0

0 0

0 0

0 0

400,000

Engineering/Administration

50,000

50,000

450,000

0

0

0

0

450,000

Total

Funding Sources

2027

2028

2029

2030

2031

Total

Storm Drainage Fund

450,000

0

0

0

0

450,000

450,000

0

0

0

0

450,000

Total

Budget Impact

The oversizing of ponds and pipes will be coordinated with development. A feasibility study by Stantec partially funded through Watershed Based Implementation Funding was completed to determine if there is a water quality benefit opportunity with oversizing. As a result of the study, it was identified that the existing water quality benefits need to be preserved with development and that the oversizing is primarily for rate control and flood control.