2027-31 Capital Improvement Plan
Annual Bituminous Mill and Overlay Project Name Annual Bituminous Mill and Overlay Project # CIF-27-002
Total Project Cost $7,900,000
City Engineer Improvement 1 - Have to do
Contact
Capital Improvements Fund
Department
Type
Street Paving
Category
Priority
Active
15 years
Status
Useful Life
Capital Improvement Fund
Fund
Description
The 2026 project includes the rehabilitation of the bituminous asphalt surface of the following streets: the River Valley Estates neighborhood, the Park Meadows neighborhood, Thrush Street between Omega Drive and Archer Street, and downtown areas between 4th and 6th Avenues bounded by Webster St and Scott St. The rehabilitation work includes milling the pavement surface, crack sealing, full depth spot repair and patching, spot curb and gutter repair, spot sidewalk repair, upgrading sidewalk/trail pedestrian curb ramp facilities and a bituminous asphalt pavement overlay.
The 2027 project includes the rehabilitation of the bituminous asphalt surface of the following streets: the XXXXXXXX The rehabilitation work includes milling the pavement surface, crack sealing, full depth spot repair and patching, spot curb and gutter repair, spot sidewalk repair, upgrading sidewalk/ trail pedestrian curb ramp facilities and a bituminous asphalt pavement overlay.
Justification This is a continuation of the City's Pavement Preservation Program to maintain existing infrastructure. The City must reconstruct pedestrian ramp facilities to comply with its ADA Transition plan adopted in 2018, increasing the cost of these projects compared to previous years' projects.
Prior
Expenditures
2027
2028
2029
2030
2031
Total
0
Construction/Maintenance
1,042,000
3,020,000
1,012,000
562,000
1,500,000
7,136,000
Engineering/Administration
118,000
330,000
108,000
58,000
150,000
764,000
1,160,000
3,350,000
1,120,000
620,000
1,650,000
7,900,000
Total
Prior
Funding Sources
2027
2028
2029
2030
2031
Total
0
Capital Improvement Fund
1,132,000
3,278,000
1,097,000
605,000
1,610,000
7,722,000
Storm Drainage Fund
12,000
30,000 20,000 22,000
8,000
5,000 5,000 5,000
15,000 15,000 10,000
70,000
Cost Sharing, SPUC
8,000 8,000
10,000
58,000
Sanitary Sewer Fund
5,000
50,000
1,160,000
3,350,000
1,120,000
620,000
1,650,000
7,900,000
Total
Budget Impact Bituminous rehabilitation projects are more cost effective than reconstructing pavements. Streets will be evaluated on a yearly basis and may be moved up or moved back in the CIP. Required ADA improvements are generally unfunded mandates to improve accessibility and to minimize liability.
Produced Using Plan-It CIP Software
38
Made with FlippingBook flipbook maker