ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
BULGARIA
TRA-N-140
Interconnection Turkey-Bulgaria
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
Bulgartransgaz EAD Bulgartransgaz EAD
Project of Common Interest Yes
Interested by PCI ? IGAs
2
Web Link
http://www.bulgartransgaz.bg/en/index.php
Bulgartransgaz EAD for the gas pipeline section on the territory of Bulgaria (100%)
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Not applicable Not applicable
2 +205,00
FID Construction Commissioning Last completed Phase :
Total CS Power (MW) Expected Load Factor
Not relevant
Not relevant
2016
% Exemption in entry direction % Exemption in exit direction
0%
Planned
0%
| 11
GRIP Central Eastern Europe 2014–2023 Annex B