ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
HUNGARY
TRA-F-148
Slovak-Hungarian interconnector (Vecsés-Szada-Balassagyarmat)
FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
ƵƐƚƌĞĂŵ ;ϭϱйͿ
Promoter Operator TEN-E Project ?
Magyar Gaz Tranzit Zrt. MGT Hungarian Gas Transit Ltd.
Not part of TEN-E Not defined yet
Interested by PCI ? IGAs
1
Web Link
D'd ƌƚ͘ ;ϴϱйͿ
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
regulated regulated
2014
2
FID Construction Commissioning Last completed Phase :
+110,00
Total CS Power (MW) Expected Load Factor
No
2013 2014/1
no
% Exemption in entry direction % Exemption in exit direction
0%
Construction
0%
| 122
GRIP Central Eastern Europe 2014–2023 Annex B