ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
POLAND
TRA-N-212
Gas Interconnection Poland-Lithuania (GIPL)
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.
Project of Common Interest Yes
Interested by PCI ? IGAs
None
Polish section, Gas Transmission Operator GAZ- SYSTEM S.A. (100%)
Lithuanian section, AB Amber Grid (100%)
en.gaz-system.pl/nasze-inwestycje/integracja-z- europejski-systemem/polska-litwa/
Web Link
TEN-E Requests
Date of Request
Year Funding Granted
30.04.2010
2012
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Regulated Regulated
2 +534,00
FID Construction Commissioning Last completed Phase :
2015
Total CS Power (MW) Expected Load Factor
No
+16,00
Not relevant
2018
% Exemption in entry direction % Exemption in exit direction
0%
Planned
0%
| 127
GRIP Central Eastern Europe 2014–2023 Annex B