ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

POLAND

TRA-N-271

PL - DK interconnection (Baltic Pipe)

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-E Project ?

GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.

Project of Common Interest Yes

Interested by PCI ? IGAs

None

en.gaz-system.pl/nasze-inwestycje/integracja-z- europejski-systemem/baltyckibaltic-pipe/

Web Link

TEN-E Requests

Date of Request

Year Funding Granted

30.06.2008 24.04.2009

2009 2010

Gas Transmission Operator GAZ- SYSTEM S.A. (100%)

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime

End of permitting phase

# of Pipelines, nodes, CS Total Pipeline Length (km)

Regulated Regulated

2 +324,00

FID Construction Commissioning Last completed Phase :

2015

Total CS Power (MW) Expected Load Factor

No

Not relevant

2020

% Exemption in entry direction % Exemption in exit direction

0%

Planned

0%

| 135

GRIP Central Eastern Europe 2014–2023 Annex B

Made with