ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
POLAND
TRA-N-245
The North-South Gas Corridor in Eastern Poland
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.
Project of Common Interest Yes
Interested by PCI ? IGAs
None
Web Link
Gas Transmission Operator GAZ- SYSTEM S.A. (100%)
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Regulated Regulated
7 +409,00
FID Construction Commissioning Last completed Phase :
2015
Total CS Power (MW) Expected Load Factor
No
+18,30
Not relevant
2023
% Exemption in entry direction % Exemption in exit direction
0%
Planned
0%
| 147
GRIP Central Eastern Europe 2014–2023 Annex B
Made with FlippingBook